शुक्रबार, चैत १६, २०८०

Mystery rivulet generated electricity added to national grid

मेरोन्यूज २०७८ वैशाख ३१ गते ८:२८

Myagdi. Electricity generated from the Mystery rivulet hydropower project constructed in Myagdi’s Annapurna rural municipality-4, Narchyang has been added to the national grid since Thursday.

The 42-MW Mystery rivulet hydro project constructed by the Mountain Energy Nepal had linked its electricity to the national grid through Dana substation.

Project resident engineer Diwakar Khadka shared that the electricity generated from all three units have been added to the central transmission system.

“The power generated from the Mystery rivulet project has been synchronized to the national grid. All the units of the project have been brought into operation for test”.

The Mystery rivulet hydel project is so far the biggest hydro project under construction in Myagdi. (RSS)

Advertisement

प्रतिक्रिया